arrow_drop_up

Project info

Changing the existing adapter on a piece of duplex pipeline on board on a oil/checmical tanker. Cutting existing adapter, drilling a bigger hole and welding the new duplex adapter safely in the middel of the engine room

Welding

Scroll through 9 pictures of duplex welding the new adapter on the duplex piping, monitored with heat camera controlled interpass.

arrow_back arrow_forward